Close Tunnel Rehabilitation in Fault Zone Using Sequential Joints Method- Case Study: Karaj Water Conveyance Tunnel,
Jalali, M. (2018) (2018),
International Journal of Mining and Geo-Engineering, 52, 1 p. 87–94,
10.22059/ijmge.2018.66155.